Paper Status Tracking
Contact us
[email protected]
Click here to send a message to me 3275638434
Paper Publishing WeChat

Article
Affiliation(s)

Structural Engineering and Technology Co. Ltd, Bucharest 021371, Romania

ABSTRACT

The paper deals with the construction works devoted to extending and upgrading the port functions to the highest European Standards. The Port of Giurgiu is located on the left bank of the Danube River, at the 493 km, and also at 65 km south of Bucharest, the Capital of Romania. Giurgiu is one of the Romanian largest Danubian Ports. Advanced computer programs were used in design. An active monitoring system, regarding the pre-existing constructions on the site, directly influenced by the excavations was also used. The adopted solutions for infrastructure were dependent by the monitoring results of construction site. The weak foundation conditions as well as the proximity of some existing buildings arouse unexpected obstacles difficult to overpass. However, by a perfect human cooperation all targets were finally reached.

KEYWORDS

Basin, cofferdam, Danube, dewatering, monitoring, mooring, tri-modal terminal.

Cite this paper

References

About | Terms & Conditions | Issue | Privacy | Contact us
Copyright © 2001 - David Publishing Company All rights reserved, www.davidpublisher.com
3 Germay Dr., Unit 4 #4651, Wilmington DE 19804; Tel: 001-302-3943358 Email: [email protected]