After the introduction of BTL (Build-Transfer-Lease) projects in 2005, most construction projects of school facilities have been implemented in BTL system. However, concern about whether the school facilities can be managed appropriately during the 20 year as operation and management period is increasing. Therefore, the necessity of reference for evaluation standard on operating costs and the establishment of LCC (life cycle costing) prediction models is coming to the fore. In this respect, the goal of this study was to extract the variables for LCC-related models and conduct analyses of the correlations of the variables using statistical analysis tool, in order to establish LCC prediction and backtracking model based on BTL project cases of school facilities. The prediction and backtracking model of LCC will be a key for budget equalization or optimum range as one way of estimating method using LCC by year and school type. In the future, it would provide the accurate reference for analyzing and managing the actual input costs against the plan and evaluating the practical cost for long-term facility management plan as the predictive management. 

KEYWORDS

Life cycle costing, prediction and backtracking model, school facility.

Cite this paper

References

About | Terms & Conditions | Issue | Privacy | Contact us
Copyright © 2001 - David Publishing Company All rights reserved, www.davidpublisher.com
3 Germay Dr., Unit 4 #4651, Wilmington DE 19804; Tel: 1-323-984-7526; Email: [email protected]